LOCKHART RIVER BRIDGE UPGRADE

Black & More managed the design and construction of the demolition and replacement of the Lockhart River Airport Road Bridge. These works were funded by TCICA and Works 4 Queensland. This bridge is a vital link on the only access road into Lockhart River.

LOCKHART RIVER NDRRA – 2015 to 2019

Black & More has been engaged to scope, prepare and acquit NDRRA submissions for Restoration of Public Assets (REPA) since 2015. Black & More also act as the consulting project manager for delivery of works through various methods including Council civil works department, sub-contractors and Contract through open tender.

PORTLAND ROAD UPGRADE WORKS 2018 CH26460-27250

Black & More managed the civil engineering design and project management for the upgrade works along 790m of Portland Road. Works included construction of 3 new culvert sites, 790 metres of sealed road and associated roadworks and drainage.

Kowanyama NDRRA

Black & More were engaged by Kowanyama Aboriginal Shire Council for the Documentation, Procurement, Construction Phase Services and Defects Liability Period to act as the consulting project manager for the delivery of works after Kowanyama experienced a Tropical Low which resulted in heavy rain events between 14 and 18 March 2016.

Due to the heavy rain events, damage was caused to the essential public assets (in this case roads) and was deemed an “eligible” disaster by QRA NDRRA. Works included;

• Scoping and road condition (REPA)

• Submission Building

• Obtaining approved Work Scope

• Tender and Procurement

• Sourcing replacement material

• Construction Management

• Reporting to QRA

• Acquittal of funding

Lockhart River Esplanade Road

Civil engineering design and project management for design of a new esplanade road. Works included construction of a new culvert, 260 metres of sealed road with flush kerbing and concrete barge unloading facility.

Portland Roads Restoration and Redevelopment Works

Black & More provided master planning, civil engineering design and project management to the construction of major disaster recovery and redevelopment works on a 62km stretch of access road to the Lockhart River community. Planning works involved coordination and logistics for delivery of works under multiple government programs including NDRRA, CRF, TIDS and CIMA. Works involve: bridging multiple creeks; re-sheeting and table drain recovery; sealing and resilience works.

Pascoe River Crossing – Portland Road

Black & More project managed the design and construction of the rectification and upgrade to the Pascoe Crossing. These works were funded by QRA (NDRRA), CRF and Council. This crossing is a vital link on the only access Road into Lockhart River.

Lockhart River Engineering Services

Black & More acts in the role of Consulting Engineer to Council and oversees the delivery of multiple civil and building engineering projects.

MIP6 NPARC Bamaga Sewerage Lagoons Upgrade and Regional Waste Facility

Black & More are managing the delivery of the upgrade works to the Bamaga Sewerage Lagoons and construction of the new Northern Peninsula Area (NPA) Regional Waste Facility. The Bamaga Sewerage Lagoons Upgrade involves the expansion of existing primary and secondary treatment ponds and increase in effluent disposal area. The NPA Regional Waste Facility project involves construction of a new landfill facility at Injinoo, new waste transfer station at Umagico and the closure of the existing landfill facility at Umagico.

Aurukun Waterpark

Black & More managed design and construction of the Aurukun Waterpark Project consisting of a new concrete splashpad and features (including tipping bucket) within the existing swimming pool footprint; a new kiosk and amenities building; two new shade structures consisting of steel framing, colorbond roof sheeting, and new concrete slabs; a masonry block plant room to house the splashpad pumps, filters, and switchboards; and finished off with live and artificial turf.