Gab Titui Cultural Centre

Management of planning, design and construction of the award winning Gab Titui. The Centre includes; two gallery areas; external performance stage; conference facilities; administration buildings; retail space and gallery storage.

Miskin Housing Estate

Lead consultant in the master planning, project management and civil engineering of a hillside subdivision and 18 housing units.

Atherton High School Independent Learning Hub

Planning Design and Construction Management of a facility to provide learning support to disabled students.  The hub has been recognised as the most advanced facility of its type in the region.

Pascoe River Crossing – Portland Road

Black & More project managed the design and construction of the rectification and upgrade to the Pascoe Crossing. These works were funded by QRA (NDRRA), CRF and Council. This crossing is a vital link on the only access Road into Lockhart River.

MIP6 NPARC Bamaga Sewerage Lagoons Upgrade and Regional Waste Facility

Black & More are managing the delivery of the upgrade works to the Bamaga Sewerage Lagoons and construction of the new Northern Peninsula Area (NPA) Regional Waste Facility.  The Bamaga Sewerage Lagoons Upgrade involves the expansion of existing primary and secondary treatment ponds and increase in effluent disposal area. The NPA Regional Waste Facility project involves construction of a new landfill facility at Injinoo, new waste transfer station at Umagico and the closure of the existing landfill facility at Umagico.

LOCKHART RIVER BRIDGE UPGRADE

Black & More managed the design and construction of the demolition and replacement of the Lockhart River Airport Road Bridge. These works were funded by TCICA and Works 4 Queensland. This bridge is a vital link on the only access road into Lockhart River.

LOCKHART RIVER NDRRA – 2015 to 2019

Black & More has been engaged to scope, prepare and acquit NDRRA submissions for Restoration of Public Assets (REPA) since 2015. Black & More also act as the consulting project manager for delivery of works through various methods including Council civil works department, sub-contractors and Contract through open tender.

Lockhart River Esplanade Road

Civil engineering design and project management for design of a new esplanade road. Works included construction of a new culvert, 260 metres of sealed road with flush kerbing and concrete barge unloading facility.