Recent Projects
We are proud to have been a part of the following exciting projects:
Brooks Road and Junction Road Upgrades
Tablelands Regional Council (TRC) received funding to provide essential upgrades to existing sections of Brooks and Junction Roads at Mungali. These roads service local farms and also provide access to a dairy and the Mungali Falls; bo...
Mapoon Water Supply Facilities Upgrades
Mapoon Aboriginal Shire Council appointed Black and More to manage upgrades to Mapoon’s water supply facilities. These new facilities include the construction of a new 1.2ML water reservoir and upgrade to the water treatment plant incl...
Tara Lagoon Footpath Rehabilitation Program, Tara
Western Downs Regional Council (WDRC) were undertaking a parklands development at the Tara Lagoon that included reconstruction of a pathway that crossed the creek inlet to the lagoon. Previously the culvert crossings had been destroyed b...
Portland Roads Restoration and Redevelopment Works
Black & More provides master planning, civil engineering design and project management for the construction of major disaster recovery and redevelopment works on a 62km stretch of access road (Portland Road) to the Lockhart River communi...
Land & Sea Management Unit Offices – “Powuppoon Haus”
Black & More managed the the concept development and construction of a new government building for Sea Rangers and Environmental Officers on Thursday Island. The building, now known as “Powuppoon Haus”, achieves a 5-star energy rating ...
Torres Strait Major Infrastructure Program
Program development and management of an awarded program to deliver health infrastructure projects across 20 island communities. Over 60 projects delivered comprising water treatment and supply; sewerage reticulation; roads, stormwater...
Department of Education State Infrastructure Enhancement Program (SIE)
Black & More acted in the role of Principal Consultant to undertake major renovations of more than 20 Far North Queensland Schools. Works included architectural, structural, mechanical and electrical upgrades. Works also entailed...
William McCormack Place
A fall arrest system is the last line of defence for workers whose duties expose them to fall hazards. Black & More recently investigated the fall arrest system at William McCormack Place, an 8 storey State Government Building in Cair...
Atherton State School Walkway Upgrade
Black & More were involved in the design, construction and management of a covered walkway connecting the Special Education Facility and the admin facilities at Atherton State School. The walkway consisted of a concrete pathway...
Yungaburra State School Prep & Admin Renovations
Black & More worked with the Department of Education and QBuild to deliver upgrades to the existing Admin and Prep Facilities. The design and management of this project presented some unique challenges. As some of the original buildings ...
Malanda State School Walkway Upgrade
As part of a larger vision for the school covered access, Black & More designed, documented and project managed a new all-weather linking walkway. The school can now access the Music Block and Covered Sports Hall via the new...
Malanda State High School Tuckshop Upgrade
Malanda SHS had outgrown their existing Tuckshop. Black & More designed, documented and managed the renovation and extension of the facility. The school now has a state of the art Tuckshop fully fitted out with high-end...
Innisfail Hospital Condition Assessment (2019)
Black & More undertook structural inspections and condition assessments for elements of the Innisfail Public Hospital. This included the hospital roof, parapets and lift shafts. Our team are trained in access at heights and also...
Gympie Terrace Stormwater Remediation
Black & More undertook detailed design of stormwater remediation works to 5 sites along Gympie Terrace at the busy Noosa River Foreshore. The existing drainage structures were in disrepair and required upgrade prior to planned streetscap...
Noosa NorthShore Campground gets a face lift
Black & More have been so glad to be a part of the renewal of the Noosa North Shore Beach Campground. After a $3.2 million face-lift, the popular holiday spot has seen some significant improvements, with a focus on improving water tr...